Stroot Ave, Connecticut

Project Snapshot
Awesome Image

  • Client:
    Tesla
  • Completion Date:
    2015
  • Capacity:
    4.932 MW
  • location:
    Connecticut, USA
  • Alten Role:
    DC Electrical Installation
  • Battery Capacity:

Project Goal:

Project description: